BG16M1OP002-2.002 - Combined procedure for design and construction of composting installations and installations for preliminary treatment of municipal waste

Project BG16M1OP002-2.002-0012

SHORT DESCRIPTION
The design, construction and commissioning of a pre-treatment plant and a composting plant under the procedure, as well as ensuring the separate collection of green and / or biodegradable municipal waste will contribute to achieving Specific Objective 1 of Priority Axis 2 “Waste” of OPE 2014 -2020. The implementation of the measures under the procedure will support the achievement of the national goals set in the Bulgarian legislation and the NWMP, for limiting by 2020 the amount of landfilled biodegradable waste to 35% of the total amount of the same waste generated by 1995. , and to increase by the end of 2020 the share of recycled waste to not less than 50% of the generated municipal waste.

According to the Ordinance on separate collection of biowaste and treatment of biodegradable waste, the target for limiting the amount of landfilled biodegradable waste is calculated for each year as a percentage of the amount of landfilled biodegradable waste compared to the amount of biodegradable waste generated in Bulgaria in 1995. The project proposal includes the construction of an installation for pre-treatment of mixed household waste and a composting installation for separately collected green and biodegradable waste in the Gorna Malina Region. The constructions installed will ensure the achievement of the objectives under Art. 31 WMA and for the municipalities in the Region. The implementation of the project proposal will ensure the introduction of a system for separate collection of green and biodegradable waste on the territory of each of the municipalities in the Region. With the implementation of the project proposal the requirements introduced in the legislation for preliminary treatment and utilization of biodegradable waste, reduction of the amount of landfilled biodegradable waste and recycling through a combination of separate collection of recyclable waste and sorting of mixed municipal waste are achieved.

OUR PARTICIPATION
Preparation of a project for construction of a pre-treatment plant and a composting plant: The current activity includes the preparation of all documents, analyzes, studies and data necessary for the implementation of the project proposal. In the implementation of the activity are developed: Forecasts for the generated waste (with detailed mass balance) and analysis of the infrastructure for waste management; Cost-benefit analysis (CRA); Preliminary (pre-investment) studies (for the pre-treatment plant and for the composting plant) with a minimum content according to Chapter Two of Ordinance № 4 of 21 May 2001 on the scope and content of investment projects; Conducted and prepared a survey on the attitudes of the population; Analysis of the need to build additional infrastructure; Analysis of the effectiveness of a centralized or decentralized approach to building waste management infrastructure; Justification for the characteristics of the necessary composting and pre-treatment services within the region for waste management and for the lack of marketing of a service with similar parameters and conditions; Information on installations for pre-treatment of municipal waste before their disposal; Information on composting plants or plants for anaerobic digestion of green waste and / or biodegradable municipal waste; Analysis of the valuation of the activities included in the project proposal; Prepared documents related to compost management: Plan for use of the obtained final product – compost, Compost quality control scheme, Residual waste treatment plan, Plan for treatment of recycled, stabilized and residual fraction; Provided expert assistance in the course of preparation of the project proposal and application.

Provision of consulting services for organization and management of project BG16M1OP002-2.002-0012 “Design and construction of a composting plant and a plant for pre-treatment of municipal waste in the Gorna Malina Region”

Beneficiary

Period

Start date:
04 June 2018
End date:
04 November 2021

Total value

9 625 546.40 BGN